Construction Cost on a 5 Marla Double-Storey House

The construction cost of a 5 Marla double-story house is around 55 lakh. The cost depends on the material used, the location where the house is being constructed, and the labor cost.

In Pakistan, the affordability of 5 Marla houses is a key factor, making them a popular choice. The grey structure of the house is the most significant cost component. The design and materials used to build the grey building determine its ultimate price. The high costs of building materials like sand, Bajri, and cement are a direct result of inflation and contribute significantly to the high cost of grey structures.

Breakdown of Grey Structure Costs

To help you better understand how much it costs to build a 5-Marla double-story house, we’ve broken down the prices of the grey structure, which includes plumbing and electrical lines. In this guide, we’ve broken down the costs for this year. If you’re considering doing this in the future, keep in mind that the prices of building materials in Pakistan change constantly. Also, this cost of construction is just an estimate. The actual price depends on many things, like the material, the layout, the cost of work, and the area. By thinking about these things, you can make a smart choice.  

Let’s dive into the material costs involved in constructing the grey structure of a 5 Marla house in 2024:

Labor Cost

  • Labor costs constitute a significant portion of construction expenses. For a double-unit 5-Marla house, labor charges for foundation, structure, plumbing, and electrical works amount to approximately PKR 974,000.

Bricks, Sand, Crush, and Rori

  • Bricks: Approximately 56,000 bricks are required, costing around PKR 784,000.
  • Sand: Utilizing Ravi and Chenab sand, totaling approximately PKR 251,075.
  • Crush or Bajri: Approximately 1,721 cubic feet of Margalla or Sargodha gravel, costing PKR 251,266.

Cement, Kassu, and Rebar

  • Cement: Around 605 bags are needed, totaling PKR 738,100.
  • Kassu: Estimated cost amounts to PKR 85,008.
  • Rebar: Approximately 3 tonnes of 60-grade Sarya, totaling PKR 780,000.

Plumbing and Wiring

  • Plumbing: Roughly PKR 674,000 is required for plumbing works.
  • Wiring: Professional electrical wiring services necessitate an investment of approximately PKR 148,000.

Diverse Costs

  • Termite Proofing: Pre-construction termite treatment requires around PKR 8,500.
  • Waterproofing: Roof waterproofing costs approximately PKR 16,444.
  • Roof Insulation: Estimated at PKR 36,354.

Total Grey Structure Cost

The aggregate of the aforementioned expenses comes to a total grey structure cost of approximately PKR 5,572,000 for a 5-marla house in 2024.

Conclusion

Constructing your own home is a significant achievement in your life. The construction cost of a 5 Marla house depends on the house’s structure, especially the materials used in construction. Based on our calculations, the approximate construction cost will be 5,572,000. Prices of materials used in construction change over time, so before starting your construction, check the latest construction costs.

FAQs

What is the covered area of a 5-Marla double-story house?

1,975 sq. ft.

The area of 5 Marla’s double story is 1,975 sq. ft., and the area of the first floor is 910 sq. ft.

How many rooms are in a 5-marla house?

You may build a home on a 5-marla plot with 3 to 4 bedrooms, living areas, kitchens, bathrooms, and a small garden.

How long does it take to construct a two-story house?

It takes approximately 4 to 6 months to construct a 5-Marla double-storey House.

How many bricks do I need to construct a 5-Marla House?

Approximately 56000 bricks are required to construct a 5 Marla house. Always try to pick good-quality bricks for construction.